Project

Manufacture and Supply of New Bottom, Annular Plates & Water Drawoff Sump Materials for NC-186 Existing Stock Tank D-1002

Categories

PROJECTS,

Time

5 Month

Status

Completed

Client

Akakus Oil Oprations - El Sharara

Description

Manufacture and Supply of New Bottom, Annular Plates & Water Drawoff Sump Materials for NC-186 Existing Stock Tank D-1002

It is a turn key project consisting of procurement and prefabrication of  tank bottom,  annular plates and water drawoff sump materials for Tank D-1002 in El Sharara oilfield.

BPC’s responsibilities are Engineering, Procurement, Prefabrication and Logistics.

Project requirements include development of engineering documentation c/w assembly drawings, workshop drawings, QA/QC and project management documentation.