Project highlight
Installation of New 14” White Product Pipeline – Azzawiya Terminal
Summary of the project
Complete delivery of a 2.5 km pipeline system for transportation of gasoline, connecting the onshore manifold at Azzawiya Refinery with Gasoline Tanks No. 503 and 504 at the Azzawiya New Terminal.
The project scope included design, engineering, construction, pre-commissioning, and commissioning, as well as mechanical, civil, electrical, instrumentation, anti-corrosion, and cathodic protection works, executed in compliance with API, ASME, and ASTM standards.
The project also included the design, procurement, and installation of a custody transfer metering system with filtration and control systems, ensuring safe, reliable, and accurate operation.