Bosna Petroleum Company > Project 4001: Removal of Existing GOSP 4’s Absorber and Re-installation at GOSP 6

PROJECT 4001: REMOVAL OF EXISTING GOSP 4’S ABSORBER AND RE-INSTALLATION AT GOSP 6

It is a turn key project consisting of removing existing Gas Absorber located at GOSP 4 and reinstalling it at GOSP 6 location.

BPC’s responsibilities are Engineering, Construction, Pre-Commissioning and Assistance to Commissioning.

Project requirements include development of engineering documentation c/w construction drawings, QA/QC and project management documentation.

Customer Arabian Gulf Oil Company

Location Nafoora, Libya

Sector Oil and Gas

Category Mechanical, Corrosion Protection

Start February 2013

Status Completed