Description
Manufacture and Supply of New Bottom, Annular Plates & Water Drawoff Sump Materials for NC-186 Existing Stock Tank D-1002
It is a turn key project consisting of procurement and prefabrication of tank bottom, annular plates and water drawoff sump materials for Tank D-1002 in El Sharara oilfield.
BPC’s responsibilities are Engineering, Procurement, Prefabrication and Logistics.
Project requirements include development of engineering documentation c/w assembly drawings, workshop drawings, QA/QC and project management documentation.